Saturday, April 11, 2009

Friday, April 10th

We have concluded another productive week at St. Charles.

The Machine Room framed up.
Before – arched entrance way from outside looking in.

After – no more archway from inside looking out (Steel Lintel in place).


Elevator shaft looking up at the steel cap.


Elevator cap being prepared for the concrete to be poured next week.





No comments:

Post a Comment